Malacca River | Oriental Sheet Piling

Malacca River

Cleaning and Beautification works at

the Malacca River, Phase IV

• River beautification works done using a permanent structure

• More than 700 metric tonnes of OZ sheet piles supplied

• Vibrohammer driving machine used to install sheet piles