About The Project


The West Wharf was constructed and commissioned in 2000. It was built and designed to handle general and industrial cargo to support the growth of local industries and industrial commodity for international markets. Due to the port need to cater daily high traffic flow, therefore the authority has decided to upgrade and enlarge the port to serve more clients.


Location of Kemaman West Whaft, Terengganu


The project is about upgrading the port by using steel pipe piles as the foundation for the Kemaman West Wharf port. The repairing and upgrading of the platform involving 112 points of foundation.

 
OD 812MM Steel Pipes reached
at site by land transport

The platform will be upgrading
 


Installation Information


Piling Machine

Crane Vibro was use during the installation because of the long pipe length of 34m to 38m. The installation also using proper guide-frame to ensure the pipes could be installed perpendicularly.


Installation Information


Piling Machine

Crane Vibro was using during the installation because of the long pipe length of 34m to 38m. The installation also using proper guide-frame to ensure the pipes could be installing perpendicularly.

Kemaman West Whaft | Malaysia


Project Owner Pangkalan Bekalan Kemaman Sdn Bhd
Address Kemaman Terengganu
Construction Contractor DSE Construction Sdn Bhd
Type of Product Use OD812mm X 112pcs X 20mm THK
Length of Implementation 34m to 38m
Total 1300 Mton
Execution Periods 3 months